SAMPLE 01Classify floor use by zone
“Classify floor use by zone” needs a distinct entry for floor use zone in the material / exposure file. For floor use zone, place on the floor plan. Within floor use zone, link to use and condition. Regarding floor use zone, request a measurable method. While reviewing floor use zone, define the acceptance point. Before closing floor use zone, retain the closeout record. Connect floor use zone to the affected proposal line. Keep floor use zone dates and locations together. Classify floor use zone as observed or unresolved. Verify floor use zone before dependent work. Retain floor use zone revisions in material / exposure.
SAMPLE 02Build an exposure and traffic map
“Build an exposure and traffic map” needs a distinct entry for exposure traffic map in the material / exposure file. For exposure traffic map, map by floor zone. Within exposure traffic map, record duration and frequency. Regarding exposure traffic map, separate traffic and chemical demands. While reviewing exposure traffic map, compare with published system limits. Before closing exposure traffic map, keep appearance outside performance criteria. Connect exposure traffic map to the affected proposal line. Keep exposure traffic map dates and locations together. Classify exposure traffic map as observed or unresolved. Verify exposure traffic map before dependent work. Retain exposure traffic map revisions in material / exposure.
SAMPLE 03Record floor history and existing layers
“Record floor history and existing layers” needs a distinct entry for floor history existing layers in the material / exposure file. For floor history existing layers, divide into labelled floor zones. Within floor history existing layers, record layers and repair history. Regarding floor history existing layers, map cracks, joints, and damage. While reviewing floor history existing layers, separate observations from testing. Before closing floor history existing layers, assign technical review before selection. Connect floor history existing layers to the affected proposal line. Keep floor history existing layers dates and locations together. Classify floor history existing layers as observed or unresolved. Verify floor history existing layers before dependent work. Retain floor history existing layers revisions in material / exposure.
SAMPLE 04Inspect cracks, joints and damaged areas
“Inspect cracks, joints and damaged areas” needs a distinct entry for inspect cracks joints damaged in the material / exposure file. For inspect cracks joints damaged, divide into labelled floor zones. Within inspect cracks joints damaged, record layers and repair history. Regarding inspect cracks joints damaged, map cracks, joints, and damage. While reviewing inspect cracks joints damaged, separate observations from testing. Before closing inspect cracks joints damaged, assign technical review before selection. Connect inspect cracks joints damaged to the affected proposal line. Keep inspect cracks joints damaged dates and locations together. Classify inspect cracks joints damaged as observed or unresolved. Verify inspect cracks joints damaged before dependent work. Retain inspect cracks joints damaged revisions in material / exposure.
SAMPLE 05Separate moisture observation from testing
“Separate moisture observation from testing” needs a distinct entry for moisture observation testing in the material / exposure file. For moisture observation testing, name the exact test method. Within moisture observation testing, map every test location. Regarding moisture observation testing, record environmental conditions. While reviewing moisture observation testing, use current acceptance criteria. Before closing moisture observation testing, set a hold point before coating. Connect moisture observation testing to the affected proposal line. Keep moisture observation testing dates and locations together. Classify moisture observation testing as observed or unresolved. Verify moisture observation testing before dependent work. Retain moisture observation testing revisions in material / exposure.
SAMPLE 06Define preparation and repair evidence
“Define preparation and repair evidence” needs a distinct entry for preparation repair evidence in the material / exposure file. For preparation repair evidence, define contaminant removal. Within preparation repair evidence, state mechanical preparation methods. Regarding preparation repair evidence, record concrete repairs by zone. While reviewing preparation repair evidence, specify profile and cleanliness evidence. Before closing preparation repair evidence, explain correction of failed areas. Connect preparation repair evidence to the affected proposal line. Keep preparation repair evidence dates and locations together. Classify preparation repair evidence as observed or unresolved. Verify preparation repair evidence before dependent work. Retain preparation repair evidence revisions in material / exposure.
SAMPLE 07Compare system families by published data
“Compare system families by published data” needs a distinct entry for system families published data in the material / exposure file. For system families published data, list every proposed layer. Within system families published data, state each layer’s role. Regarding system families published data, record thickness and technical data. While reviewing system families published data, match to confirmed exposure. Before closing system families published data, condition selection on substrate tests. Connect system families published data to the affected proposal line. Keep system families published data dates and locations together. Classify system families published data as observed or unresolved. Verify system families published data before dependent work. Retain system families published data revisions in material / exposure.
SAMPLE 08Plan phasing, cure and reopening
“Plan phasing, cure and reopening” needs a distinct entry for phasing cure reopening in the material / exposure file. For phasing cure reopening, sequence around actual operations. Within phasing cure reopening, plan isolation and alternate routes. Regarding phasing cure reopening, record ventilation and odour questions. While reviewing phasing cure reopening, define cure evidence by zone. Before closing phasing cure reopening, authorize reopening from written criteria. Connect phasing cure reopening to the affected proposal line. Keep phasing cure reopening dates and locations together. Classify phasing cure reopening as observed or unresolved. Verify phasing cure reopening before dependent work. Retain phasing cure reopening revisions in material / exposure.
SAMPLE 09Specify QA and maintenance records
“Specify QA and maintenance records” needs a distinct entry for qa maintenance records in the material / exposure file. For qa maintenance records, issue one condition record. Within qa maintenance records, normalize testing and preparation. Regarding qa maintenance records, compare layers and quality checks. While reviewing qa maintenance records, expose exclusions and change rules. Before closing qa maintenance records, retain closeout and care documents. Connect qa maintenance records to the affected proposal line. Keep qa maintenance records dates and locations together. Classify qa maintenance records as observed or unresolved. Verify qa maintenance records before dependent work. Retain qa maintenance records revisions in material / exposure.